Six chapters, in widescreen. Tap a chapter to jump, or just watch.
Chapter 01It begins with a conversation.
Chapter 02Drawn with care. Priced line by line.
Chapter 03Ground broken, schedule set.
Chapter 04Floor by floor, it rises.
Chapter 05Craft in every finish.
Chapter 06Keys in your hand.
Home packages
Choose how your home will feel.
Pick a tier, slide the area and watch the number move. Typical inclusions are listed here; exact brands and grades are fixed in your BOQ before work begins.
It is an indicative range (±8%) based on area, package, city and the extras you select. A detailed BOQ after a site study and finalised design gives the firm figure, and that is the figure you approve before we start.
Do you handle drawings and approvals?
Yes. Architectural design, structural drawings and local-authority approvals can be included in the turnkey scope. Government fees are paid at actuals.
How is payment structured?
Stage-linked: a booking amount, then instalments tied to completed milestones (foundation, slab, masonry, finishing, handover). You only pay for work that is complete.
How long does a home take?
A typical 1,500 sq ft G+1 home takes about 8–10 months from approvals to handover. The estimator gives a timeline for your specific size.
Do you take government tenders and large commercial projects?
Yes, government and institutional works are a core part of our portfolio. Use the contact form to discuss a specific tender or scope.
Which regions do you serve?
We operate across 12+ states, with offices in Patna (Bihar) and Greater Noida West (U.P.). Tell us your location and we will confirm availability.
Is there a warranty or after-sales support?
Warranty and after-sales support terms are set out in your agreement. Ask our team for the specifics that apply to your project.
Can I change the design after construction starts?
Minor changes are possible with a transparent change note, revised cost and timeline shown before anything is executed. Major structural changes are best locked at the design stage.